Strip Out North Sydney (2060)
North Sydney is corporate office country with a thick band of harbour-side apartment buildings on the eastern flank toward Lavender Bay and the western flank toward Waverton. The office towers around Walker Street, Berry Street and Miller Street come up for tenancy turnover constantly — make-good office de-fits are the bread and butter of our North Sydney work — and the apartment renovations on the harbour edge run almost continuously through the year.
Local Building Stock in North Sydney
North Sydney 2060 building stock is roughly half commercial office (mostly post-1985 Class 5 towers, 15-40 storeys, full service-lift access, raised access floors), one-quarter mid-to-high-rise residential apartments (1980s-present), and one-quarter older walk-up and detached residential on the harbour-side fringes.
Strip Outs We Do in North Sydney
Corporate Office De-fit (North Sydney)
North Sydney office de-fits on Walker Street, Berry Street and Miller Street are scheduled 6pm to 6am with building manager inductions current. Make-good to lease standard, full waste removal, and patching/painting available as a turnkey package.
Harbour-Side Apartment Strip Out (North Sydney)
Harbour-side apartment strip outs on the Lavender Bay, Kirribilli and Waverton edges of 2060 come with strata-imposed work hours, lift floor protection and corridor protection. Most bathroom and kitchen strip outs complete in a single day.
End-of-Lease Make-Good (North Sydney)
End-of-lease office make-goods in North Sydney are stripped to the lease specification and patching, painting, and ceiling tile reinstatement are coordinated as part of the same job. We've stripped to handover for most of the major REITs in the precinct.
Asbestos Removal (North Sydney Commercial)
Pre-1990 North Sydney office buildings frequently contain bonded asbestos in vinyl flooring, ceiling tiles and mechanical pipe insulation. We hold the SafeWork NSW asbestos removal licence to handle this on the same scope.
North Sydney FAQs
Are you inducted for the major North Sydney landlords?
Our lead crews carry current inductions for buildings managed by the major REITs and building managers active in the North Sydney precinct. Where a building requires its own induction, we factor lead time into the programme.
How fast can you start a North Sydney office de-fit?
Most North Sydney commercial jobs mobilise within 5 to 10 working days. Lift bookings and induction paperwork are usually the longest lead-time items.
Do you handle apartment strip outs in Kirribilli and Lavender Bay?
Yes — apartment strip outs on the harbour-side edge of North Sydney come with strata documentation, lift bookings and common-area protection as inclusions.
Can you handle make-good after the strip out?
Yes. Patching plaster, repaint, ceiling tile replacement and floor finish reinstatement can be quoted alongside the strip out as a turnkey make-good package.
From a half-floor de-fit on Walker Street to a single bathroom in a Kirribilli apartment, same crew, same standards, same clean handover. Call 0402 820 532 for a North Sydney strip-out quote in 24 hours.
Get a free quote in 24 hours · Call 0402 820 532
Please enable JavaScript to view the full Oz Demo Group site.